01Study Stages
• Scoping Study: preliminary resource conversion, order-of-magnitude capex/opex, early-stage economic screening
• Pre-Feasibility (PFS): mining option comparison, process route selection, Modifying Factors assessment
• Feasibility Study (FS): full mine design, detailed economic model, bankable report compilation
• NI 43-101 Preliminary Economic Assessment (PEA)
02Technical Evaluation
• Mining engineering: open-pit shell optimisation (LG algorithm), underground development comparison, production scheduling
• Processing and infrastructure: metallurgical testwork coordination, plant and tailings facility planning
• Economic evaluation: CAPEX/OPEX estimation, DCF model, NPV/IRR/payback and sensitivity analysis
• Operational improvement: throughput uplift and cost optimisation advisory for producing mines
03Deliverables
- Scoping / PFS / FS study reports
- PEA report (NI 43-101)
- Financial model (Excel with sensitivity analysis)
- Mining and processing design
- Operational improvement plan
04Representative Case
Feasibility studies delivered for a Kazakhstan Pb-Zn project and a Sri Lanka gemstone project; resident technical services in Mongolia and Africa.
